Wellingborough

The Wellingborough solar plant is located in Northamptonshire, England.


The solar farm at Wellingborough uses LDK PV modules for a total peak capacity of 8.5 MW connected to the local 33kV distribution network.

The plant has been operational since March 2014. Lark Energy was the EPC contractor. The project has a 25-year site lease and planning permission in place for an equivalent period and is now owned by an institutional investor following a sale of the plant in May 2015. Operations and maintenance management services continue to be provided by Lark Energy.

 

 

Location
Northamptonshire

Size
8.5 MWp

Installer
Lark Energy

Status
Operating

This website is owned by Armstrong Energy Limited and is for informational purposes only, it does not constitute an offer or a solicitation to invest. Armstrong Energy Limited is authorised and regulated in the United Kingdom by the Financial Conduct Authority (FCA) (no. 612134). Armstrong Energy Limited is registered in England and Wales (no. 07991720).

Site by Creative Intent