Kenninghall

The Kenninghall solar farm is located in Norfolk.


The Kenninghall solar plant uses LDK modules for a total peak capacity of 8.0 MW.

The plant was connected in March 2015. Lark Energy was the EPC contractor. The project has a 25-year site lease and planning permission in place for an equivalent period.

Revenues are derived from a mixture of ROCs (at 1.4 ROCs per MWh), LECs and power sales.

Asset management is provided by Armstrong Energy and operations and maintenance management services is provided by Lark Energy.

Location
Norfolk

Size
8.0 MWP

Installer
Lark Energy

Status
Operating

This website is owned by Armstrong Energy Limited and is for informational purposes only, it does not constitute an offer or a solicitation to invest. Armstrong Energy Limited is authorised and regulated in the United Kingdom by the Financial Conduct Authority (FCA) (no. 612134). Armstrong Energy Limited is registered in England and Wales (no. 07991720).

Site by Creative Intent